Shandong, CN · 00:00 GMT+8
Engineered in China · Delivered to 20+ markets
Multi-storey / 03 Single category brief

Density without compromise.

When land is expensive or unavailable, the building has to grow upward. A multi-storey steel frame adds capacity on the same footprint — provided floor loads, services, fire strategy and vertical movement are resolved together.

  • ISO 9001 / 14001 / 45001
  • AISC · EN · AS/NZS design
  • Engineer reply in 1 business day
Multi-Storey Steel Structures
Multi-levelFloors to project
Heavy floorsEquipment and racking loads
Urban sitesTight footprint
Fast brief / no obligation

Get a tonnage and budget range.

Three details are enough to start. An engineer reviews the brief and replies within one business day.

No newsletters. Your brief stays with the engineering team.

The brief

What this building has to get right.

Multi-storey construction is not a single-storey frame repeated. Every additional floor changes the load path, the fire strategy, the service routing and the way goods or people move between levels. A frame that works for an office may be unsuitable for a workshop with heavy equipment on level two.

SDKM coordinates floor systems, cores, lifts, stairs and façade interfaces from the first layout. The structure is then detailed so each floor can serve its actual duty — storage, production, office or mixed use — without overbuilding the areas that do not need it.

01 / Typical configurations

One category. Several ways to solve it.

A category is a brief, not a fixed catalogue item. These are the configurations we engineer most often; the final frame follows your span, loads and site.

Multi-Storey Office Building 01
Open plates Services Comfort

Multi-Storey Office Building

Long spans and open floor plates with services routed cleanly through the frame. Vibration, acoustic separation and floor-to-floor height are resolved so the building feels as good as it performs.

Multi-Storey Industrial Workshop 02
Heavy loads Goods lifts Process flow

Multi-Storey Industrial Workshop

Production floors stacked on one footprint. Heavier floor loads, goods lifts and equipment access are designed in, keeping each level open enough for machinery and process flow.

Vertical Storage Warehouse 03
Racking Lifts / ramps Urban density

Vertical Storage Warehouse

Storage on several levels linked by lifts or ramps. Racking loads repeat on every floor, while columns stay out of the aisle grid and vertical traffic is planned rather than improvised.

02 / Engineering envelope

The parameters we need before sizing steel.

None of these are catalogue defaults. Each one is agreed from the project brief, then fixed in the design basis and connection drawings.

Send your parameters
LevelsProject-specific; structure checked at each floor
Floor systemComposite deck or concrete on steel deck
Floor loadingSet by office, racking or equipment use
Vertical accessGoods lift, passenger lift, stairs or ramp
Fire strategyCompartmentation and protection to local code
FacadeProject-specific; coordinated with frame tolerances
Design codesAISC / EN / AS-NZS / SNI / PNS
Have the numbers? Send span, height and site location. We return a tonnage range, not a brochure.
03 / Where it fits

Applications this system is built around.

The same frame family can serve very different operations. The layout and envelope change; the engineering discipline does not.

01Urban factory
02Office headquarters
03Institutional building
04Multi-level warehouse
05Mixed-use complex
06Vertical cold storage
04 / Delivery scope

One package, from design basis to erection sequence.

The scope is agreed before fabrication. Nothing is cut until the drawings, coatings, packing plan and site sequence are aligned.

STEP / 01

Design basis

Loads, spans, code, crane duty, racking or temperature range are fixed and reviewed with your engineer.

STEP / 02

Detailing

Shop drawings, connection details, bolt lists and erection sequence are issued before steel is cut.

STEP / 03

Fabrication

CNC cutting, fit-up, welding and trial assembly, with hold-point inspection records.

STEP / 04

Protection & packing

Surface preparation, coating system, bundle marks and export packing planned against the site sequence.

STEP / 05

Site support

Erection drawings, marked assemblies and remote or on-site guidance for the bolt-up phase.

Included in the steel package
  • Primary frame, purlins and bracing
  • Connections, anchor bolts and base plates
  • Shop drawings, bolt lists and erection sequence
  • Mill certificates and coating records
  • Marked export bundles and packing list
Quoted separately / by others
  • Foundations, slab and civil works
  • Erection labour and site equipment
  • Permits, inspections and local compliance
  • Freight, insurance and import duties

Final split is fixed in the offer, before fabrication.

05 / Built examples

The system, delivered on a real site.

All project deliveries
06 / Procurement notes

Questions buyers ask before releasing steel.

If your question is not here, send it with the project brief. We answer with the engineering reason, not a sales line.

How many storeys can a steel building have?

There is no fixed cap in the steel system itself; the practical limit comes from the local code, fire strategy, floor loads and foundation conditions. We design each floor to its actual duty rather than assuming every level carries the same load.

Which floor system should we use?

Composite steel deck is fast and light; concrete on steel deck adds mass and acoustic performance. The choice depends on vibration, fire rating, floor flatness and the equipment the floor will carry. We compare the options against those requirements.

Can goods lifts be added later?

They can, but the shaft, floor openings and support loads are much easier to design with the frame. A lift added after construction usually means local strengthening and disruptive openings.

How is fire protection handled?

The fire strategy is agreed before member sizing. Protection may be intumescent coating, board or a concrete encasement, depending on the required rating and the section types. The coating system and its thickness are then included in the fabrication scope.

Question not covered? Send it with the brief or WhatsApp an engineer.

07 / Start this brief

Send the constraint.
We engineer the rest.

Span, load, temperature, site access, code, timeline — whatever is fixed. An engineer reviews it and comes back with the questions that matter and a route to quotation.

  • 01
    Budget rangeUS$/m² band for your span, height and duty.
  • 02
    Tonnage estimatePrimary, secondary and coating allowance.
  • 03
    Engineering questionsThe few items we need before design freeze.
Multi-Storey Steel Structures project brief Reply within 1 business day

Your brief is used only to respond to this project. No lists, no resale.

SDKM certificate

Certificate