Warehouse / 02 Single category brief

Buildings organised around throughput.

A warehouse is a flow diagram built in steel. Clear height decides how many rack levels fit; the column grid decides whether the racking and forklift routes work; the dock decides how fast freight enters and leaves.

  • ISO 9001 / 14001 / 45001
  • AISC · EN · AS/NZS design
  • Engineer reply in 1 business day
Steel Structure Warehouse
High-bayClear height to operation
Dock-to-rackTraffic-first layout
20+Export markets
Fast brief / no obligation

Get a tonnage and budget range.

Three details are enough to start. An engineer reviews the brief and replies within one business day.

No newsletters. Your brief stays with the engineering team.

The brief

What this building has to get right.

Storage volume is only one measure of a warehouse. The more important questions are how goods arrive, where they wait, how they are picked and how quickly they leave. Those answers set the column grid, clear height, door count and traffic lanes long before roof and wall profiles are chosen.

SDKM plans the frame around the operation, not around a standard bay. Multi-tenant phases, future racking changes and dock expansions are reviewed at concept stage so the structure can absorb them without cutting into the aisles.

01 / Typical configurations

One category. Several ways to solve it.

A category is a brief, not a fixed catalogue item. These are the configurations we engineer most often; the final frame follows your span, loads and site.

Multi-Bay Logistics Warehouse 01
Multi-tenant Expandable Racking grid

Multi-Bay Logistics Warehouse

A repeating bay type that can be leased, partitioned or extended without structural rework. Shared columns keep steel weight sensible while preserving clear aisles and independent dock allocations.

Cross-Docking Facility 02
Dock-to-dock Fast turnover Traffic lanes

Cross-Docking Facility

Freight enters one side and leaves the other, often within a day. Door count, dock-to-dock distance and column-free traffic lanes matter more than storage volume, so the plan starts with vehicle movement.

Loading Dock & Canopy 03
Dock height Canopy Fleet-ready

Loading Dock & Canopy

Dock height, canopy depth, bumpers and door openings are detailed as one interface. Small in tonnage, these components decide whether every trailer loads dry and on schedule.

02 / Engineering envelope

The parameters we need before sizing steel.

None of these are catalogue defaults. Each one is agreed from the project brief, then fixed in the design basis and connection drawings.

Send your parameters
LayoutMulti-bay / cross-dock / zoned operations
Clear heightSet by racking and lifting equipment
Column gridOptimised around racking and aisle widths
DocksDoor count, height and canopy per fleet
MezzanineOptional; designed with the primary frame
RoofStanding seam or insulated panel
Design codesAISC / EN / AS-NZS / SNI / PNS
Have the numbers? Send span, height and site location. We return a tonnage range, not a brochure.
03 / Where it fits

Applications this system is built around.

The same frame family can serve very different operations. The layout and envelope change; the engineering discipline does not.

01Logistics park
02Distribution centre
03Regional fulfilment hub
04Port transit warehouse
05Multi-tenant storage
06E-commerce operation
04 / Delivery scope

One package, from design basis to erection sequence.

The scope is agreed before fabrication. Nothing is cut until the drawings, coatings, packing plan and site sequence are aligned.

STEP / 01

Design basis

Loads, spans, code, crane duty, racking or temperature range are fixed and reviewed with your engineer.

STEP / 02

Detailing

Shop drawings, connection details, bolt lists and erection sequence are issued before steel is cut.

STEP / 03

Fabrication

CNC cutting, fit-up, welding and trial assembly, with hold-point inspection records.

STEP / 04

Protection & packing

Surface preparation, coating system, bundle marks and export packing planned against the site sequence.

STEP / 05

Site support

Erection drawings, marked assemblies and remote or on-site guidance for the bolt-up phase.

Included in the steel package
  • Primary frame, purlins and bracing
  • Connections, anchor bolts and base plates
  • Shop drawings, bolt lists and erection sequence
  • Mill certificates and coating records
  • Marked export bundles and packing list
Quoted separately / by others
  • Foundations, slab and civil works
  • Erection labour and site equipment
  • Permits, inspections and local compliance
  • Freight, insurance and import duties

Final split is fixed in the offer, before fabrication.

05 / Built examples

The system, delivered on a real site.

All project deliveries
06 / Procurement notes

Questions buyers ask before releasing steel.

If your question is not here, send it with the project brief. We answer with the engineering reason, not a sales line.

How much clear height do we need?

Start from the racking layout and the lift height, not from a generic figure. Each rack level, beam depth and forklift free-lift adds up. We test the operational height against the frame cost so the building is neither short nor over-specified.

Can racking loads be confirmed later?

Racking layouts change more often than buildings. We ask for the expected bay loads, aisle widths and future expansion at design stage, then document the limits. A later change can be checked against those limits instead of guessed.

Are mezzanines included?

They can be. Mezzanine columns and floor loads are designed with the primary frame. Adding a mezzanine after fabrication often requires extra columns or local strengthening, which is more expensive than designing it in.

How do you handle dock interfaces?

Dock height, canopy projection, bumpers, door sizes and insulation are detailed against the vehicle fleet and the local weather. The objective is a dry, level transfer and a canopy that keeps rain off the trailer bed.

Question not covered? Send it with the brief or WhatsApp an engineer.

07 / Start this brief

Send the constraint.
We engineer the rest.

Span, load, temperature, site access, code, timeline — whatever is fixed. An engineer reviews it and comes back with the questions that matter and a route to quotation.

  • 01
    Budget rangeUS$/m² band for your span, height and duty.
  • 02
    Tonnage estimatePrimary, secondary and coating allowance.
  • 03
    Engineering questionsThe few items we need before design freeze.
Steel Structure Warehouse project brief Reply within 1 business day

Your brief is used only to respond to this project. No lists, no resale.

SDKM certificate

Certificate